debadging, gauges arrive, hood dampners install, and tire test fit.

October 23, 2005 on 12:20 am | In Progress | 3 Comments

First we started off with some debadging:
1

A big “thank-you” (replace “thank” with “F***”) goes out to the genious at SOA who decided that they needed to put holes in the trunk for the big subaru emblem:
2

All the pretty new parts (defi BF boost, EGT, oil temp, fuel pessure, tein bonnet dampner, defi indicator, defi visors, control unit II, and defi VSD HUD):
3

Dampners installed:
4
5

do the 265’s fit??? :shock:
6
7
8
9

oh and we made the new parts cleaner pretty with a tintmasters, shocker, and the don’t sweat it sticker:
10

Powered by WordPress.
Entries and comments feeds. Valid XHTML and CSS. ^Top^